16 Oct 2024

Wellingtonian furious at decision to demolish City to Sea bridge

From Morning Report, 6:19 am on 16 October 2024

A Wellington resident is furious at the decision to demolish the City to Sea bridge. The pedestrian bridge opened in 1993, connecting Civic Square to the Wellington waterfront precinct at Whairepo Lagoon. Resident Lesleigh Salinger spoke to Ingrid Hipkiss.