5 May 2015
Faulty concrete poured at NZ's biggest motorway project
Faulty concrete's been poured at one of Auckland's big motorway projects and it has to be repaired. Ramp 4 on the Great North Road Interchange that's part of the Waterview Connection needs repairing.