9 Oct 2018
Wairarapa train service gets $96m boost
The line from one side of the Remutaka Range to Wellington will receive $96 million after being plagued with problems, such as slow trips and long delays.
The line from one side of the Remutaka Range to Wellington will receive $96 million after being plagued with problems, such as slow trips and long delays.