30 Jan 2013
Construction of 35 million dollar bridge to take 2 years
The construction of the first bridge in Canterbury to be built to the new earthquake design codes is going to take nearly two years and cost over 30 million dollars.
The construction of the first bridge in Canterbury to be built to the new earthquake design codes is going to take nearly two years and cost over 30 million dollars.